Qualifications Review Representative Office is a point of interest located in Liffey Region, Fontaine.
It is a temporary satellite office of the Fontaine Research Institute managed by Desnos.[1] It is responsible for processing adventurers who are recruited to investigate the Institute ruins. Prior to the explosion, it was the location of Raimondo's research team.[2]
Quests[]
World Quests
Features[]
Interactables[]
External Reconstruction Support FAQ[]
This interactable is located on the ground floor of the Qualifications Review Representative Office on a desk.
- Required documents and registration information for adventurers (temporary):
- Commission resume, income statement, information regarding commission evaluations, commission statistics, total number of stars (rating), proof of adventure qualifications, travel history for the prior 30-day period, and all past and current Adventure Handbooks.
- Habitual residence, contact address, contact information, emergency contact, your current name, names you've used in the past, any pseudonyms, and/or aliases.
- Statement of good faith, liability notice, obligation notice, and disclaimer notices.
- If the adventurer has not brought complete documentation with them, the gaps should be plugged on the spot in a timely manner. Any applicant with a criminal record or who are suspects will be turned over to the authorities immediately.
Project Proposal[]
This interactable is located on the bookshelf of the Qualifications Review Representative Office's ground floor.
- To support the development of research at the Fontaine Research Institute of Kinetic Energy Engineering, it has been decided through internal discussions to initiate Phase 2 expansion for the Institute, with Senior Researcher Raimondo Havenport in charge of said project.
- After through investigation, argumentation, analysis, and research, it has been concluded that the eastern region of Liffey has favorable geography, excellent transportation conditions, and faces no threat from wild monsters, making it a highly suitable location for the second Fontaine Research Institute.
- ...
- The project is currently suspended because Raimondo Havenport has been transferred to the position of Senior Technician for the Fontaine Research Institute of Kinetic Energy Engineering.
- ...
- During Phase 2 of the Fontaine Research Institute expansion project, construction workers discovered an undocumented human-excavated tunnel that led to the private lab of deceased Senior Researcher Bravais. The research facility was found undamaged. The Maison Gestion has been debriefed. Pending further action.
NPCs[]
- Desnos — Fontaine Research Institute Qualifications Review Director, Representative Office
Other Languages[]
Language | Official Name | Literal Meaning |
---|---|---|
English | Qualifications Review Representative Office | — |
Chinese (Simplified) | 驻外资质审核办公室 | |
Chinese (Traditional) | 駐外能力審核辦公室 | |
Japanese | 在外資質審査オフィス | |
Korean | 자격 심사 주재 사무실 Jagyeok Simsa Jujae Samusil | |
Spanish | Departamento Externo de Auditoría | External Audit Department |
French | Bureau d'évaluation des qualifications | Qualification Assessment Office |
Russian | Отдел управления аудитом зарубежных квалификаций Otdel upravleniya auditom zarubezhnykh kvalifikatsiy | |
Thai | สำนักงานตรวจสอบคุณวุฒิในต่างประเทศ | |
Vietnamese | Văn Phòng Thẩm Định Tư Chất Bên Ngoài | |
German | Repräsentanzbüro zur Eignungsprüfung | Representative Office for Qualifying Examination |
Indonesian | Kantor Perwakilan Peninjauan Kualifikasi | |
Portuguese | Escritório Representativo do Departamento de Revisão de Qualificações | |
Turkish | Yeterlilik Değerlendirme Temsil Bürosu | |
Italian | Ufficio di rappresentanza del Dipartimento per le valutazioni delle qualifiche |
Change History[]
Released in Version 4.1
References[]
- ↑ NPC Dialogue: Desnos
- ↑ World Quest, Fontaine Research Institute Chronicles: Fontaine Research Institute, Stagnating in the Rubble